All guidesRunning your team

Practitioner KPIs in a small allied health practice: what to measure, and how to talk about it

Billable hours matter, but they aren't the whole picture. A short guide to setting fair targets, tracking them fortnightly and keeping the conversation about support, not pressure.

The Tasklith Team16 November 20262 min read

Every practice owner needs to know whether the practice is busy enough to pay everyone. Most practitioners don't love talking about hours. A good KPI conversation manages both: it's honest about the numbers, and it's clearly in the practitioner's interest.

What to measure

  • Hours delivered against target, each fortnight. The core number. Measure it over a fortnight, not a day, because single days swing.
  • Cancellations and no shows. A low hours number with a lot of cancellations is a different conversation from a low number with an empty diary.
  • Clients not seen within their frequency. A practitioner can hit their hours and still have clients slipping.
  • Reports and assessments delivered on time. The work that doesn't always show in session hours.

Setting a fair target

  • Set it per fortnight, and pro rata for part time staff.
  • Build it up for new starters over their first months instead of starting at full load.
  • Adjust it for leave. A target that ignores a week of annual leave is a target that will be missed.
  • Write it down, so the practitioner and their team leader are looking at the same number.

An example of adjusting for leave

Say a practitioner's target is 50 hours a fortnight across ten working days, so five hours a day. They take two days of leave. Their target for that fortnight becomes 40 hours, not 50. It's a small calculation, but doing it every time is what makes the number feel fair.

Talking about it

Look at the number together, early in the one on one, and move on quickly when it's on track. When it isn't, ask what got in the way before asking for more. Often the answer is something you can fix: an empty diary that needs referrals, admin that should sit with someone else, or a client mix that is heavier than it looks.

What not to do

  • Compare practitioners against each other in a team meeting.
  • Only mention the number when it's low.
  • Change the target without explaining why.
  • Measure hours and nothing else, so the work that doesn't bill goes unseen.
The number starts the conversation. It shouldn't be the whole conversation.

Where Tasklith fits

Tasklith shows each practitioner's billed hours against their fortnightly KPI, with leave days taken into account, and team leaders get a view across their whole team for the last six fortnights. The same figures open the fortnightly catch up, so the conversation starts with numbers everyone has already seen.

See how Tasklith helps your team

One platform for content, participants, compliance and more.

Explore features